A particularly interesting drilling project with each bore hole presenting its own health and safety concerns, these included:
- Flood river levels (as the rig and equipment were below this level, constant communication was required with the river control authority, escape and rescue plans developed).
- Access through and working in a "working forest".
- Steep site set-ups with tall vegetation requiring helicopter support to mobilise the drilling rig and equipment to site.
- Working adjacent to State Highway 1 (high traffic flows at open road speeds).
Depth : 35m
Drilling Method : Fully wire line cored (HQ size)
Number of Wells : 6 holes in project