Location : Mangere Arts Centre
Testing: In situation and down hole SPT’s, push tubes and shear vane testing
Foundation investigation for the proposed Mangere Arts Centre. This was carried out within a public car park during normal operating hours. Vehicular traffic and keeping the public a safe distance from the drilling operations created additional hazards that were risk assessed and controlled.
Drilling Method : Continuous wire-line coring
Equipment : 422
Number of Wells : 7