Location : Huntly West
These exploration wells were drilled in an area of the Huntly Coal fields where there where “gaps” in the information recorded from wells drilled in the ‘70s and ‘80s. Well completions included full cement grout back to surface (some 8,000 lt volume) and multiple deep pressure transducer installations. The wells were drilled on a double shift type operation as to reduce costs to the client and to meet their project deadlines.
Depth : ~450m
Drilling Method : Wash drill with HQ wireline cored tail
Equipment : 423
Number of Wells : 4