RIG #6 - GEFCO Speed Star T200K

Manufactured in/by: GEFCO ( Enid, Oklahoma 73703, USA)

Rig NumberSix (6)
ManufacturerGEFCO ( Enid, Oklahoma 73703, USA)
ModelSpeed Star T200K (Upgraded from SS185K spec)
Serial Number907807
Year of Re-manufacture2012 (T200K upgrade by GEFCO, OK, USA)
CarrierKimble C3100 5-Axle Oil Field Type carrier
EngineCaterpillar C-18 ACERT (Rated @ 630HP derated to 575HP)
Derrick62 feet 5 inches (19.025m) overall length with minimum 51 foot (15.545m) working space above table. Table equipped with removable 23” diameter X 17-1/2” ID master bushing that accepts standard API slips. Rectangular steel tubing construction electrically welded. Raised and lowered hydraulically by two cylinders. Maximum dynamic hook load capacity of 196,400lbs
Pipe LoaderFitted on derrick for hydraulic positioning of single drill pipe below top-head rotary drive
Top-head rotary driveHydrostatically powered top-head rotary drive with maximum torque of 195,000-inch/lbs. Rotation speeds from 0 – 50 RPM in high torque mode and 0 – 140 RPM in low torque mode. 3” diameter fluid course equipped with a floating sub (to allow smooth drill pipe connection), 5000psi rated 3” ID swivel and “Drillers Panel” controllable top-head drive “Lock-up” rated to 96,000 inch/lbs of torque.
Hoist systemTwin hydraulic cylinders and heavy-duty cable type system actuated by variable displacement pump with regeneration function.
Hoist CapacitiesStandard dynamic hoisting force of 196,400lbs. Boost dynamic hoisting force 117,000lbs
Hoist Speeds0 – 140 FPM @ 0 – 71,351lbs
0 – 97 FPM @ 71,351lbs – 117,000lbs
0 – 66 FPM @ up to 196,400lbs
Pull down system30,000lbs maximum
0 – 209 FPM
Jib winchHydraulic driven with planetary gear reduction. Drum equipped with 200ft of 5/8" cable. Bare drum line speed 140 FPM @ 8,000lbs. Hydraulically actuated jib boom swings from outside of derrick to inside for automatic alignment with bore hole.
Auxiliary winch#1, Hydraulic driven with planetary gear reduction. Drum equipped with 200ft of 5/8” cable. Bare drum line speed 70 FPM @ 8,000lbs.
#2, Hydraulic driven with planetary gear reduction. Drum equipped with 200ft of 1/2” cable. Bare drum line speed 90 FPM @ 4,000lbs.
Break-out systemTwo "C" type tongs with hangers and counterbalances. System includes hydraulic actuator cylinder both sides of rig and have provision for sizes from 2-3/8" to 10-3/4" diameters.
New generation GEFCO "Iron roughneck" currently been developed.
Operators stationHinged left hand side orientated operator’s consol. All controls grouped and labelled for convenience and safety
Hydraulic levelling jacksFour (4) 60” (1524mm) jacks with levelling pads. Two (2) located front and two (2) located at rear. All have independent controls and safety lock valves (backed up by four (4) mechanical jacks).
Fluid piping3” fluid piping with 4000psi WP connections, standpipe bend hose and rotary hose with 5000psi rated swivel
Pipe racking boardFolding type for ease of transportation. Capacity of approximately 7,000’ (2,133m) of drill pipe and related drill collars
Ancillary Equipment
Sub structureTwo (2) piece custom sub-structure, complete with handrails stars and walkways. Working platform has set-back capacity of full pipe racking board. Allows approximately 9’ 10” open height under slips bowl to ground for BOP equipment.
Dog houseTrailer mounted, Includes Rig Management, Crew Change House, Parts and Mechanical Room.
Generator house#1, Caterpillar, LC-5 325kva 60Hz in steel house. Oil Field Master Skid Mounted
#2, Galaxy – P 650 GX 670kva 50Hz in steel house. Oil Field Master Skid Mounted
Fuel / Lube ComboLubster with bunded holding tanks grease and oils, 11,000lt capacity fuel tank, pressurized fuel manifold for ancillary plant and rig fuel feed. Oil Field Master Skid Mounted
Tubular equipmentThree (3) hydraulic pipe tubs, One (1) centre tub with catwalk, One (1) set manual pipe racks for casing
Drill Pipe, 2500m+ 4”OD, 14ppf, Range 2, XT39 tool joints
Drill Collars, 8” OD, 6-1/2” OD and 4-3/4" OD
Well Control EquipmentFive (5) station well control closing unit with drillers remote panel (with dedicated 88kva generator and 185cfm compressor mounted on four (4) axle tuck trailer)
11” annular preventer (3000psi)
11” double ram preventer (3000psi) with CSO, 2-3/8”, 2-7/8”, 3-1/2”, 4” and 4-1/2” ram blocks
Mud cross for above 7-1/16” 3K to 11” 3K, 9” 3K to 11” 3K, 11” 3K to 11” 3K.
7-1/16” Rotating head
7-1/16” annular preventer
4-1/16” HCR (3000psi)
4-1/16” gate valve (3000psi)
2-1/16” gate valve (3000psi)
2-1/16” check valve (3000psi)
4-1/16” x 2-1/16” choke manifold (5000psi)
Poor boy degasser, 800GPM capacity
Solids control systemGN Solids Control, 1000GPM circulating capacity
Tank #1, 257bbls volume
Tank #3, 275bbls volume
2x GNZS703 Linear Motion Scalping shakers
1x GNZJ703-2S12N Mud Cleaner (including 1x GNZS703 Linear Motion Shaker, 12x De-silter cones and 2x De-sander cones)
1x GNLW452S Decanter Centrifuge
2x 55kw Jet Mud Mixers
4x JBQ15 15kw Mud Agitator
Mud guns
Trip tank
Mud pumpsPumps #1 and #2; Tulsa Rig Iron, TT680, 6” diameter x 8” stroke, triplex, 600 HP rated. Oil Field Master Skid Mounted
Pump #3 (if required), Gardner Denver T.H.E. 5-1/2” x 5” stroke, triplex, 215 HP rated. Oil Field Master Skid Mounted
Water tank300bbl Oil Field Master Skid Mounted
Bulk fuel storage100bbl Oil Field Master Skid Mounted
OtherAssorted casing handling and make-up tooling
Assorted tubing handling and make-up tooling
Double plug 7” cement head
2x Telehandler Genie model GTH844
2x Oil Field winch trucks (with tail rollers and 1x 80,000lb primary winch and 1x 45,000lb secondary winch each)
2x Roller tail articulated trailers